cliodhna
Well-Known Member
...for small periods of time? We are building 5 stables at our house..currently having the site levelled and having the groundwork done. Problem is the only turnout at the house will be a 50m X 40m arena with a sand and rubber surface. Grass turnout is only a few mins down the road but is leased.
The plunge has been taken anyway and the work has already begun. Does anyone else have a system like this and how does it work for them?
The plunge has been taken anyway and the work has already begun. Does anyone else have a system like this and how does it work for them?