Mobile stables

janina

Member
Joined
10 November 2011
Messages
12
Location
norfolk
Visit site
I was wondering what you all think of mobile stables/field shelters i have a good piece of land and am starting from scratch. The field has good natural shelter from all sides but i would like to have a stable. would anyone recomend a mobile stable? what floor would you use? do you think it should go in the field or just outside? Or would a permant stable be better with a concrete base? thank you for your advise :)
 

Booboos

Well-Known Member
Joined
5 January 2008
Messages
12,776
Location
South of France
Visit site
People in general opt for mobile field chelters because they can't get planning for stables (mobile field shelters cannot have a harcore floor and need to be moved very often). If you opt for stables you will need planning permission, a concrete base and then the stables of your choice (you might want to think about water and electricity while you are doing all this).
 

ILuvCowparsely

Well-Known Member
Joined
5 April 2010
Messages
14,885
Visit site
if you cant get planing permission the best thing you can do is get a shelter which is mobile and put slip rails across to keep horse in
 

YasandCrystal

Well-Known Member
Joined
27 April 2009
Messages
5,588
Location
Essex
Visit site
We have both mobile stables and mobile field shelters. As a previous poster says you cannot put down any hardcore or stone chippings or concrete/tarmac with mobile units. I just have rubber mats down and then my beds. Outside I have some wood bark chip to help with any mud. I just didn't want the expense of going through planning although I am sure I would get permission and I didn't intend on wintering the horses on this land, but changed my mind.
I am really pleased with mine. We built the shelters ourselves, but bought the stable block (3) secondhand :)
 

Toby_Zaphod

Well-Known Member
Joined
8 August 2005
Messages
9,301
Location
Midlands
Visit site
I was wondering what you all think of mobile stables/field shelters i have a good piece of land and am starting from scratch. The field has good natural shelter from all sides but i would like to have a stable. would anyone recomend a mobile stable? what floor would you use? do you think it should go in the field or just outside? Or would a permant stable be better with a concrete base? thank you for your advise :)

As has been said you will need planning permission for stables so field shelter may be your only option as some councils are declining permission for stables. As has been said field shelters don't need planning permission however they must be able to be moved & furthermore you must move them possibly every 6-8 weeks. Several horse owners have either been prosecuted or have had enforcement notices served by councils in the last few months regarding their 'field shelters' that are actually being treated as stables. This is because they are not being moved & having hardcore bases etc put down. I suppose they see it as flouting the planning laws?
 

janina

Member
Joined
10 November 2011
Messages
12
Location
norfolk
Visit site
Thank you for all your responses i would really like stables instead of field shelters does anyone know how long and how much planning permission usually is? yasandcrystal - if you don't mind me asking what type of bed do you put on the rubber mats?
 

Booboos

Well-Known Member
Joined
5 January 2008
Messages
12,776
Location
South of France
Visit site
Your local council should have most of that information on its website. They usually require plans of the stables, specification of the matrials they will be constructed from and a fee of a few hundred pounds (depends on the council but if you assume 300 pounds you won't be far off). They then generally take 8 weeks to make a decision.

However, it may be worth having an informal chat with your local planning officer as he may be able to suggest things they do and do not like and you can adjust your plans accordingly before you submit them.
 

indie999

Well-Known Member
Joined
16 January 2009
Messages
2,975
Visit site
Hi I have mobile shelter in quite a wet field but it is always dry as I have put it in a dry corner. I put Hemcore down but probably would use rubber matting if I was going to use it to stable overnight etc. Mine is a double Chart but we didnt put doors on(although I have them) I paid extra to have rain protective overhang on roof. I have never moved it at all.

Yes you need planning if you put a hardstanding down.
 
Top