Fools Motto
Well-Known Member
18 ponies in 7 different 'patches' - max size of the largest patch is maybe 1.5 acres.
Electric fenced.
When ground allows the machine poo picks.
When wet trying to think of a way of doing it that takes the least time or the least physical effort.
Can poo pick into dustbins, then tip dustbins into the loader which will be parked outside the patches. - trouble is, heavy to lift said dustbins.
Wheel barrow a good 200meters at best to a 'dump zone'
Ramp to loader will be too steep to push barrow into.
I've seen at another yard the builders tonne bags, each placed near each paddock. When full tractor with forks picks it up to dump. I think it'll fill too quickly with said amount?
Or leave it to look rubbish and wait for machine?
Give me ideas on what might work, or how you'd do this.
Electric fenced.
When ground allows the machine poo picks.
When wet trying to think of a way of doing it that takes the least time or the least physical effort.
Can poo pick into dustbins, then tip dustbins into the loader which will be parked outside the patches. - trouble is, heavy to lift said dustbins.
Wheel barrow a good 200meters at best to a 'dump zone'
Ramp to loader will be too steep to push barrow into.
I've seen at another yard the builders tonne bags, each placed near each paddock. When full tractor with forks picks it up to dump. I think it'll fill too quickly with said amount?
Or leave it to look rubbish and wait for machine?
Give me ideas on what might work, or how you'd do this.