cobden
Well-Known Member
HELP ! I have my ponies at home, and in the summer had 2 stables and a feed room put up. The builders who dug out for the concrete base had to take out quite a lot as the area is on a slight slope. Instead of taking off the top soil they put the whole lot back on the field and ran over it with a JCB to flatten it. Clay soil, nightmare. I have now paid £1500 to have land drains and a load of chippings put down, and the ground levelled over the top. However, because it is clay the water is sitting on top and I daren't let the ponies on it as they will churn it up in days. What should I do ? I want to use it as a turn out area but even after all the work it still seems unuseable. Should I put bark chippings on top ? A few more tons of stone chippings ? Any advice on how to rescue this much appreciated !