badgerdog
Well-Known Member
My yard owner has just put in an arena made of sand and shredded carpet. I've been told that this takes time to bed in but how long is it likely to take?
Is there anything we can do to speed this process up? YO thinks that riding the horses on will do the trick but my horse sinks in about 4 - 5 inches so I daren't go out of walk!
I was thinking of raking it and YO said she would drag a gate over it with her 4 wheel drive.
Is the mixture likely to be wrong?
Any ideas welcome.
Is there anything we can do to speed this process up? YO thinks that riding the horses on will do the trick but my horse sinks in about 4 - 5 inches so I daren't go out of walk!
I was thinking of raking it and YO said she would drag a gate over it with her 4 wheel drive.
Is the mixture likely to be wrong?
Any ideas welcome.
