Gucci_b
Well-Known Member
I'm also on very flat CLAY land just below the water table, I need help advise on how, what, when from you guy's. We are on a very tight budget I feel that we should clear the area, put down loads (ton's) of hard core to get above the water table, then drainage then clean stone membrane and the surface. Also where is the best surface and cheepest to buy from. I have also heard that you do not need planing if you have post and tape fencing?????