NeverSayNever
Well-Known Member
I am currently having 20 tonnes of road planings laid in front of my stables, on an area that was a good few inches deep with mud... the idea (or so I thought) was that the guy doing it was going to scrape back/clear the mud, lay a membrane, dig in and edge with boards and fill with the planings. Ive just been out to check on progress and it looks like they have laid the membrane straight on top of the mud without digging any out, the planings are going on at a depth of about 6 inches but a heap of moisture is seeping up through the surface and the whole thing is squelchy rather than hard packed... so far. They assure me once its rolled down and compacted it will be ok, that the moisture will come to the surface and drain off (its on a slight slope). Does this sound right 