blackcob
🖖
*LOL Daily Mail*
http://www.dailymail.co.uk/news/art...lk-pets-leads-longer-68-face-1-000-fines.html
I do hope this doesn't become popular, I'll be buggered. Seems to be targetting those who use a flexi - eh? I thought it was all these off-lead staffies people were getting up in arms about.
Oh well, off to walk the dog on a 50ft lead...
http://www.dailymail.co.uk/news/art...lk-pets-leads-longer-68-face-1-000-fines.html
I do hope this doesn't become popular, I'll be buggered. Seems to be targetting those who use a flexi - eh? I thought it was all these off-lead staffies people were getting up in arms about.
Oh well, off to walk the dog on a 50ft lead...