The order period can vary a little through the year, it will always be up to 6 weeks at least over Xmas as nearly all manufacturing builds in 2 weeks shut down even if they don't. I'm still quoted 3-4 weeks but since lockdown and the takeover of the UK distributorship by Zebra I'd say it's usually a bit over 4 weeks to get to the retailer in the UK.