lbe
New User
Hi
we have a well drained 20 x 40 sand/rubber school, unfortunately its amazing draining properties also mean it dries out rapidly. THis means the surface becomes very deep, cause it to shift and therefore rides closer to the liner.
We have looked at a lot of products and we are trying to make the new surface retain moisture and require less grading/harrowing. Has anybody used flexiride in similar circumstances? Would like to know if it prevents the problem, how much watering is required etc. Just a bit worried we will spend a lot of money and have a deep, shifting surface, with something on top!
ANy feedback or advice would be great
Thanks
we have a well drained 20 x 40 sand/rubber school, unfortunately its amazing draining properties also mean it dries out rapidly. THis means the surface becomes very deep, cause it to shift and therefore rides closer to the liner.
We have looked at a lot of products and we are trying to make the new surface retain moisture and require less grading/harrowing. Has anybody used flexiride in similar circumstances? Would like to know if it prevents the problem, how much watering is required etc. Just a bit worried we will spend a lot of money and have a deep, shifting surface, with something on top!
ANy feedback or advice would be great
Thanks