shiresrus123
Well-Known Member
hi, we are getting a stable base built soon, and so drainage is coming up
is it a good or bad idea for each stable to have a drainage point or better to have a gully for it to flow into
also good or bad to have a slight gradient to enable flow of wee towards the drain point/gully, and if so, back to front or front to back?
any other things to look into please say
thanks!
is it a good or bad idea for each stable to have a drainage point or better to have a gully for it to flow into
also good or bad to have a slight gradient to enable flow of wee towards the drain point/gully, and if so, back to front or front to back?
any other things to look into please say