Sooty
Well-Known Member
Hurrah! This is my last post on this subject, but I had to thank everyone who has been so supportive and behind me on my long campaign to have the barriers on our road bridge raised. The work was finished last week, and although they are not the full 1.8m originally recommended, they are now 1.4m with 600mm solid infill at the base, and are a huge improvement. I might take a picture for contrast when there is some daylight (that will be at the weekend then!), but the support, suggestions and encouragement I have received on here have made the whole thing possible. Thank you!